Translations:Überholen eines Zuges/7/en

Aus RailRoad&Co.-Wiki
Zur Navigation springenZur Suche springen

Make Block 2 the:

  • Approach block (green) of the passing loop. In this block, the arriving train is checked to determine whether it should pass or not.