Translations:Überholen eines Zuges/8/en

Aus RailRoad&Co.-Wiki
Zur Navigation springenZur Suche springen

Make blocks 1, 2, and 7:

  • Control block (monitoring block). The purpose here (presumably) is to check whether the train located within it has a higher priority.