Translations:Überholen eines Zuges/8/en
Aus RailRoad&Co.-Wiki
Make blocks 1, 2, and 7:
- Control block (monitoring block). The purpose here (presumably) is to check whether the train located within it has a higher priority.
Make blocks 1, 2, and 7: