Translations:Weichen - Pause zwischen dem Schalten/5/en

Aus RailRoad&Co.-Wiki
Zur Navigation springenZur Suche springen

Would that mean:

  • that with a setting of 200 ms
  • and two routes requested at the same time
  • with 5 switches each (so 10 switches in total),
  • in any case 10 * 200 ms will pass,