Operating points

Aus RailRoad&Co.-Wiki
Zur Navigation springenZur Suche springen
Verwendung
thumbs


Services

Deux types de services

Fig: Services

Les services peuvent être classés en deux catégories, bien que ceci ne soit pas écrit dans le manuel officiel.

Active operating points move the trains within the operating point itself. In addition to the block in which coupling (uncoupling) takes place (marked in red), these require additional blocks.

Passive operating points only intervene in the ongoing train operation in a controlling or regulating manner or operate locomotive functions (e.g. tunnels).

Active operating points

  • Shadow station
  • Locomotive shed
  • Shuttle track
  • Locomotive change
  • Pushing operation
  • Shut-off hump

Passive operating points

  • Station
  • Single-track line
  • Single-track operation
  • Slow speed section
  • Tunnel
  • Junction
  • Exit
  • Siding point
  • Shunting area
  • Storage area
  • Quantity control
  • Booster
  • Display case

Prerequisite

A fully configured block is required so that the first train arriving can stop at the desired location.

Fig: Block Schattenbahnhof

Special marking

The special marking is used at some operating points. This is always required when a second train or a second locomotive is to enter a block that has already been reserved (by other vehicles).

Fig: Special marking

Download instructions

It is stated in the document: TC10Gold Alle Betriebsstellen.pdf each operating location is discussed individually.

This document also includes a TC file. Archive (Zip file): Projekt TC10B1 alle BS V3.zip


-- Silvio Richter 19. Dez. 2023 (UTC)
bearbeitet: Uslex (Diskussion) 07:49, 20. Dez. 2023 (UTC)