Overtaking a train

Aus RailRoad&Co.-Wiki
Version vom 23. Dezember 2025, 16:39 Uhr von Uslex (Diskussion | Beiträge) (Die Seite wurde neu angelegt: „Also: *The last block before the switch to the passing loop should be green. *All blocks before the switch where faster trains need to be considered should be yellow.“)
Zur Navigation springenZur Suche springen
Verwendung
thumbs

Operating point Alternate point

Overtaking a train using a station

I have set up an operating point where a "higher-value train", e.g. a passenger train, is supposed to overtake a freight train, "lower-value train", in a passing loop.

Fig.: Operating point passing loop

Check if he should swerve

Mr. Freiwald provides the following information in the forum:

Make Block 2 the:

  • Approach block (green) of the passing loop. In this block, the arriving train is checked to determine whether it should pass or not.

Make blocks 1, 2, and 7:

  • Control block (monitoring block). The purpose here (presumably) is to check whether the train located within it has a higher priority.

Don't choose too short a waiting time

Caution: If you have set the maximum waiting time to only 5 seconds, the slow train making the pass will continue its journey quite quickly. The following fast train will hardly have enough time to reserve enough track to prevent the slow train from doing so.

Also:

  • The last block before the switch to the passing loop should be green.
  • All blocks before the switch where faster trains need to be considered should be yellow.


--‎ Uslex (Diskussion) 08:58, 23. Dez. 2025 (UTC)