locomotive changeover or shunting area

From RailRoad&Co.-Wiki
Jump to navigationJump to search
This page is a translated version of the page Betriebsstelle Lokwechsel oder Rangierbereich and the translation is 78% complete.


Verwendung
thumbs

locomotive changeover depot

Locomotive change without exit

I want to use the locomotive change operating point to drive a locomotive up to the rear of the train. How do I go about it?

Fig: Operating points

locomotive change or shunting area

Mr. Freiwald writes about this in forum

At the operating station locomotive change the locomotive is changed. This means:

  • a locomotive is separated from the incoming train,
  • drives out
  • and another locomotive drives in
  • and is added to the train.

Therefore, not only an entry block is always required, but also an exit block over which the separated locomotive can exit.

If it is only a matter of bringing a locomotive in and adding it to a train, the shunting area operating point can be used for this purpose.


Höchster Komfort oder volle Freiheit

Herr Freiwald schreibt dazu im Forum


  • Lokwechsel. Höchster Komfort. In dieser Betriebsstelle sind die Bewegungen - Abkoppeln und Wegfahren der alten Lok sowie Einfahren und Ankoppeln der neuen Lok - bereits eingebaut. Es müssen dafür keine eigenen Zugfahrten gebildet werden. Diese sind bereits in der Betriebsstelle enthalten.
  • Rangierbereich. Volle Freiheit. In dieser Betriebsstelle können Zugverbände beliebig gebildet und getrennt werden. Nicht nur An- und Abkoppeln bzw. Wechsel von Loks.


Weblinks


--‎ Uslex (Diskussion) 18:11, 2. Jan. 2025 (CET)
bearbeitet: DeepPurple 20:13, 8. Jan. 2025