locomotive changeover or shunting area

Aus RailRoad&Co.-Wiki
Version vom 3. Januar 2025, 13:04 Uhr von Uslex (Diskussion | Beiträge) (Die Seite wurde neu angelegt: „Therefore, not only an entry block is always required, but also an exit block over which the separated locomotive can exit.“)
Zur Navigation springenZur Suche springen
Verwendung
thumbs

locomotive changeover depot

Locomotive change without exit

I want to use the locomotive change operating point to drive a locomotive up to the rear of the train. How do I go about it?

Fig: Operating points

locomotive change or shunting area

Mr. Freiwald writes about this in forum

At the operating station locomotive change the locomotive is changed. This means:

  • a locomotive is separated from the incoming train,
  • drives out
  • and another locomotive drives in
  • and is added to the train.

Therefore, not only an entry block is always required, but also an exit block over which the separated locomotive can exit.

Wenn es nur darum geht, eine Lok einfahren zu lassen und einem Zug hinzuzufügen, so kann hierfür die Betriebsstelle Rangierbereich verwendet werden.

Weblinks

--‎ Uslex (Diskussion) 18:11, 2. Jan. 2025 (CET)